Thursday, May 6, 2010
Appraisal is in.
The appraiser for the bank came in with a number for the house and land that will support going ahead with the building process. The appraiser works to try to find comparable sales in the area that support a valuation; in the case of a house that has not been built, he works from the architects plans, the builders description of materials and the physical characteristics of the land. It took them an extra week to do so because comps are hard to find, but they came in with a good number so we're happy. This can be a significant problem in rural areas. The entire system is set up for more densely populated areas. There are regulations about the distance out they can look and there are regulations about how recent the sales must be. The same appraisal number will be used when we transition to permanent financing when the house is completed and the building loan is paid off with a traditional mortgage.
We'll be toasting tonight!
Monday, May 3, 2010
Building pad goes in.
We hiked up the hill behind the building site and took some photos while the building pad was being formed. This shot shows the complete driveway and the equipment working on the pad itself.
The next photo shows a view of the driveway from the county road.
I was worried that our driveway would be overly conspicuous form the road and am pleased to see how little visual impact it has on the landscape.
May 2nd, and it was snowing. This shot shows the view standing just above the pad and looking to the NW.
The panoramic photo below is looking north across the pad. The curve of the cut in the photo is a distortion from the stitch software.
You can click on any of the photos in the blog to see larger versions.
The next photo shows a view of the driveway from the county road.
I was worried that our driveway would be overly conspicuous form the road and am pleased to see how little visual impact it has on the landscape.
May 2nd, and it was snowing. This shot shows the view standing just above the pad and looking to the NW.
The panoramic photo below is looking north across the pad. The curve of the cut in the photo is a distortion from the stitch software.
You can click on any of the photos in the blog to see larger versions.
Sunday, May 2, 2010
Site sketches
Looking North
The house was designed in December 2009 and January 2010 via an intense and extremely enjoyable flurry of back-and-forth emails between Penelope, myself and Dan Wheeler of Wheeler-Kearns Architects in Chicago. Dan has been great to work with. I took Dan's drawings and entered them into a brain-damaged CAD system which does allow for 3-D views and rotations of the house. Penelope used the images generated by the system as a basis for these drawings. She printed them and then cut and pasted them onto some stitched panoramic views and then colored them with oil pastels to render the house as we view it.
Looking South
The end of the house is facing almost due east.A garage will be placed behind the house (off the right end of this photo) and will be half buried in the hillside.
Saturday, May 1, 2010
Breaking Ground
After almost three years of false starts and dead ends; three house designs, more than a couple of contractors and a few bankers later, we broke ground on the driveway to the building spot on the upper forty today. It follows a draw up as high as possible before making a large sweeping curve to the right to gain the crest of the hillside where the building spot is. In the photo above you can see the bulldozer below on the county road and the first cut of the new road is just above Erdős.
In less than two hours we had a path working most of the way up to the building site. This is a small bulldozer, and it is amazing how quickly is can make a passable path. Did not drive up the cut but we could have.
The driveway must make it to the high ground, on the sunlit hillside to the right of the bulldozer in the photo. You can see the first cut of the driveway headed up the draw to the left of the bulldozer. It cuts across the draw below the aspens and then cuts up the hill just below the top that is in the sunlight. If you click on the photo You can see a bit of it up near the top.
We're still waiting on final funding for the full project so it's possible that we'll just end up with an expensive driveway and no house, but even this would be progress. The views from up on the hill are incredible, see the banner at the top of this blog. The driveway is a real challenge and having it done will mean a huge hurdle has been crossed.