Sunday, July 8, 2012
Railing Done
Well ... almost. The top rail is in and sanded. Now all I need to do is seal the wood parts with something. We used Penofin on the deck last year - could use another coat. The Penofin is a natural rosewood oil. It gave off a kind of organic/rotten stink for a week or so after we put the first coat on last year. It is tough stuff though and looks great.
One thing that is happening, and I don't believe I like it, is that contact with steel/iron stains the Batu wood. Under the roof line where the rusty rainwater drips off, the wood is very dark, almost black. The new railing is having the same effect on the boards that run under them. I got used to the dark boards under the roof line - I expect I'll get used to this too. Just a note that batu reacts to iron/steel.
Saturday, July 7, 2012
Squirrel Creek Fire - aftermath
I have more entries to make - but for now I will leave it with a photo of the house after the fire had passed.
The house stands, miraculously unharmed, and the cottonwoods along the creek are still green. The cheat grass and many of the junipers on the hills across the canyon burned as did the meadow and most of the underbrush on the far side of the creek.
The house stands, miraculously unharmed, and the cottonwoods along the creek are still green. The cheat grass and many of the junipers on the hills across the canyon burned as did the meadow and most of the underbrush on the far side of the creek.
Thursday, July 5, 2012
Squirrel Creek Fire (Day 5)
On July 5th, the same crew from Arizona came back to suppress the hotspots under the cottonwoods. Rain is on the way and the fire is predicted to be 100% contained by Saturday July 7th.
| Engine boss Robert Russo. |
Roads are now open and residents are being allowed to come back to their properties. With help from friends in town we moved all the furniture back in. The smoke seen on the drive back from town was not promising though the heavy clouds were.
| Fire still putting off a lot of smoke on its western edge. |
Wednesday, July 4, 2012
Squirrel Creek Fire (Day 4)
Fourth of July. With calm winds and heavy air support the fire has been growing only very slowly if much at all. It's estimated to be around 10,000 acres now. In the afternoon a crew with a tanker truck came in to suppress hotspots under the burned cottonwoods along the creek.
| Cameron Hendricks. |
The crew was from Tuscon Arizona and was managed by a Forest Service fire fighter from Montana.
Tuesday, July 3, 2012
Squirrel Creek Fire (Day 3)
![]() | |
| View of the house on July 3rd. |
In the morning of July 3rd I walked up the hill above the house in the morning while Randall watered the aspen trees we'd planted along the driveway this spring. The fire under the cottonwoods was still smoldering and there were occasional flareups. By now the fire was estimated to be around 9,000 acres.
Thankfully the power came back on, which allowed us to get back to work on the railing. Thanks go out to Carbon Power for that. With power on we had something to do. At one point during the day I had to drive down to put out a flareup in the cottonwoods where the fire had crossed the creek.
In the evening, we drove up to the top of the ridge behind the house and watched the C130 air tankers dropping retardant on the fire which was still raging west and north of us.
Monday, July 2, 2012
Squirrel Creek Fire (Day 2)
| Randall walking in what was once dense sage habitat above the house. |
By the morning of July 2nd all of the fuels immediately around the house had been burned but the fire was far from out. It burned up and across the steep hills on the far side of the canyon, from the northwest to southeast. It burned through the cheat grass, junipers and bitterbrush on the slopes. The power was out and Randall filled buckets from the creek so we had water to use in case of a flareup near the house. With the water we put out some smoldering hot spots around the house.
| Fire burned the far side of the canyon. |
When it got into the steep brush choked gullies it flared up violently. This went on all morning. The house was safe, except for the possibility of embers from the close fires igniting the deck. Randall and I saw on the deck watching the show with buckets ready.
The fire under the cottonwoods was hard to watch - they are such a key component providing a sense of place for the house - if they were gone this would be a very different place to live. But after watching the fires for a few hours I realized that, although we would lose some trees, the majority remained unburned and that the fire was clearing out dense choking underbrush. Since the fire burned through it is park-like in the lower 40. Time will tell how many cottonwoods will die. The majority of them are on this side of the creek and so were not burned.
Sunday, July 1, 2012
Squirrel Creek Fire (Day 1)
| The fire broke over the ridge up the road at 4:30PM. |
![]() |
| Firefighters arrive to defend the house. |
The main factors contributing to the defensibility of the house are the metal roof, the stucco siding and the fact that there is a good buffer zone from the house itself to the sagebrush. I mowed the tall native grass away the from the house. We worked hard to grow that grass, but it'll come back. The wooden deck is no asset in a fire situation but it can be, and was, watered down to prevent it from burning.
Randall and I evacuated the immediate area to watch from a safer distance after the trucks were in place around the house. You can see him driving out in his VW camper in the bottom photo of the series. We dropped his bus at Woods Landing and drove up to the observatory on top of Jelm.
![]() |
| View from Jelm observatory - house in lower left of photo. |
| By the evening, the fire had grown from 70 acres to around 2000 acres. |
When wind started blowing the smoke eastward toward Jelm we couldn't see anymore (and could not breath) so we drove down the mountain only to find a rather frantic evacuation of Woods Landing underway. Randall furtively slipped into his VW bus intending to stay in Woods Landing overnight. He did end up sleeping the night there - after videotaping the nighttime defense of Woods Landing against the fire. I moved to a high point along Hwy 230 which allowed me to look down the canyon toward the house. Unfortunately, from where I watched, I was not quite able to see the house itself.
![]() |
| Looking west from the bench above HWY 230. |
| The fire burned down through a steep draw behind my house - 100' flames? |
![]() |
| Looking towards Woods Landing as the fire raced across the flats driven by high winds. |
More Railing Work
| Railing goes in. |
| Deck wetted down. |
I am referring to June 30 as "Day 0" and July 1st as "Day 1" of the fire.
Saturday, June 30, 2012
Rust Patina for the Deck Railing & Fire Starts
Randall and I built the deck on the house last summer and a year later the railing is nothing more than sections of 2x4 nailed from post to post. We've had a year to think about it. When sitting on the deck, a major component of the view is the cottonwoods which are low down, so a major design goal for the railing was that it block the view as little as possible. We looked at wire railings which are held by turnbuckles, but they seemed a bit too modern with respect to the rest of the house. We'd pretty much decided that a plain metal railing would be best. Another design goal for the railing was to have them match the rusted roof if possible. Ideally this meant a rust patina, but we also thought of finishing it with paint. Building a rust patina was an experiment that turned out pretty well.
![]() |
| Contro II, Gerald DiGuisto, 1978 |
As an undergraduate in college I studied with the sculptor Gerald DiGuisto. Gerry was trained at the Boston Museum School and at Yale. He was a perfectionist regarding every aspect of his work. This perfectionism included the process of constructing the subtly nuanced layers of rust patina on his work. It was pure alchemy and his formulas were guarded secrets. Memories of Gerry griped me as I tried to figure out a formula for rusting the new railings.
The metal railings were welded up in Fort Collins by Randall's friend Rick at Flash Portable Welding. Once we had selected the plain 1/4" bar stock we left the details of the spacing of up to Randall and Rick. As soon as I saw them I knew they were perfect. There is plenty of information on the web about rusting metal. We ended up with the following process:
- Degrease at the car wash using engine cleaner.
- Sprayed with muratic acid (diluted 3 cups acid/ gallon of water)
- Sprayed with 1/4 cup salt, 1/4 cup vinegar, 1 pint Hydrogen Peroxide
By the end of the day we had a nice rust patina on the railings. Unfortunately, this was also the day we first saw smoke from what became the Squirrel Creek Fire.
After working on hte railings all day, I loaded up one car with important papers and valuables and drove it to town. Friends there drove me back out to the house with a horse trailer in tow and we loaded a number of large pieces of furniture for them to take back to town.
Subscribe to:
Posts (Atom)









