Sunday, August 29, 2010

Slate Flooring

Overloaded Toyota - carrying a wee bit less than 1 ton of slate.



Fiftyfive boxes weighing 35 pounds each, 40 in the back and 10 inside.

The next decision is how to layout the slate.  I have always been partial to random patterns avoiding long straight lines.  My favorite is a Versailles pattern.  We had a similarly colored slate floor laid out in that pattern in a previous  house.  The problem is that the slate we bought only came in 12x12 or 16x16 pieces.  The Versailles pattern requires 8x8, 8x16 and 16x24.

Versailles Tile Pattern

After studying it for a while, I realized we could make a 16x24 piece out of one 16x16 and one 8x16.

Modified Versailles pattern.

 This adds an extra line which is not as elegant, with respect to the randomness of the pattern, but I think it is a good solution.  We laid out some tiles in the hall using masking tape to simulate the pattern to see how it looks.

A modified Versailles pattern dummied up with masking-tape to simulate grout lines.

I considered that a tile design breakthrough. You can lay out a modified Versailles pattern using only 16x16 tiles. Slate is soft and cuts easily. But now, it turns out the slate is so subtly nuanced that we almost hate to cut it. Here is it laid out in a grid. If the grout was dark it would look better. 

A simple grid pattern.
This is a simple offset pattern which still has continuous lines

An offset pattern.

If we were to go with the offset pattern (which I doubt) we'd want to rotate it so that the long lines do not run down the entry hall. The following view is from the side of the layout above.

Same offset pattern viewed from side.

Friday, August 27, 2010

Septic system goes in.

Cleanout where the pipe exits the house.


Drain leads to the septic tank - leach field to the right.




Tuesday, August 24, 2010

The Painter (and his wife)

Leslie, the painter.
I got these photos of Leslie and his wife, two of the three from Three Creamer's Painting.  I caught them before they left one evening in a fume filled house and they were kind enough to allow me to take some photos of them.  The light int he room with the windows covered with plastic was rather amazing.


Leslie and Susan.


Leslie and Susan work together on jobs and they'd just (almost) finished priming all the rooms in the house. 


Stucco Done


Finished stucco - the door color was supposed to be a bit more orange.
With advice from Dan, the goal was to match natural concrete.
Orange roof, orange dog.
The apparent color is completely dependent on the light.






Saturday, August 14, 2010

Interior Views for Dan.

First morning view of the end (from the road) with the stucco base coat.

Southeast  living room door.

East wall of living room.
North bedroom - closets and entry from hall.

North bedroom - sleeping alcove, bathroom door and exit to outside.

Looking into the hall from the north bedroom, south bedroom across.

Looking from south bedroom across hall back the the north.


Looking toward the south west door - closet on left and sleeping alcove on right.

South bedroom, looking toward bath and exit to hall.

Looking east down the hall from the main floor bedrooms.

Closets to the left of the front door (on left).

Looking in from the front door - closets on left, big room to right.

Looking up from inside the kitchen to skylights above stairs.

North wall of the the big room - kitchen on back wall.

Looking at the kitchen wall -- 8" exhaust pipe in ceiling for rangetop vent..

Looking down on the south east door and light cove.

Future bookcases in alcove on east wall.

North west exit from kitchen -- cabinets below cove with double wall ovens.

Kitchen wall.


Looking down stairs from landing half way up to the loft.

Skylights over stairs.

View from the loft bedroom into the loft bath.

Closets on left and right.


Skylight in loft bedroom.

Shower in loft bath.

Future toilet (left) and sink (right) in loft bath.

Looking to loft bedroom from loft bath, stairs to right.

Front door and entryway hall closets.

Looking to hall from doorway into kitchen.

Southwest exit form kitchen -- front door to left.

Southeast exit from living room.

Northeast exit from living room.

Northwest exit from kitchen, future door to deck on right in hall.


Southwest exit from living room (and Erdős). Red tape covering.