Saturday, July 31, 2010

More Roof

Roofing screws with neoprene washers.

The roof is not completed, though one side is. To us, it's looking great. We've had some afternoon showers while they've been putting it on and you can see the progression of the rusting. The really orange streak is the piece that was on top of the packet when the steel was delivered.


The following photo shows the box of nails sitting on a clean sheet  of corrugated steel before the rusting starts.


Insulation


The insulation is a water-based foam that is blown in.  The product is called Icynene.  Amazingly, it took two guys just one day to do the job.  It seems pretty obvious to me that this technique results in a tighter house than fiberglass bats.  The material is a green build product.  It's fireproof and I'm told that it makes for a soundproof house, though we do not have much noise to contend with out here.

Looking toward the loft.



Front door -- foam in header.


Looking up from the front entry.

Future door to deck opposite front door.

Perc Test



To get a permit fromthe county to install  the septic system we had to do a perc test.  You need to have a minimum of thee holes which are filled with at least 12" of water.  Since the well and electricity are not hooked up yet, we put a horse trough in the back of my pick-up, filled it with water and then hooked up a hose to fill the test holes.  You measure from the top of the hole to the level of the water every 10 minutes for an hour to calculate the capacity of the soil to absorb water.  To get a consistent reading you stick a wire hanger wire into the soil next to the hole which serves as a pointer to the measuring stick. Just looking at it you can see that the soil is very sandy and is well suited for the leach field.

     
Hole #1   Hole #2   Hole #3

Thursday, July 29, 2010

Roofing Starts

Richard Serra Sculpture at DIA Beacon.
After a lot of deliberation we decided to go with weathering steel roofing.  Weathering  steel is formulated to produce a beautiful rust patina and, in principle, stop rusting once the surface patina is formed.  Sculptors love it.  After walking through the Serra installations at DIA Beacon in last summer I knew that if it was possible at all, I wanted to live under a rusted roof.  There are a lot of issues and it remains to be seen if it was a good decision.  It is a corrugated roofing material that is made from significantly heavier gauge steel than more standard steel roofing materials.  Some manufacturers claim that in the proper conditions it will last 80 years; even so, no one will warranty it.  We live in an arid climate and it should be good here; it is not good near salt water or in a humid climate. 

Starting the installation of the corrugated (not yet) rusted roof.
You can see a streak of rust above the cab of the lift.

Rusted roofing is very popular in Steamboat Springs CO and up in Jackson WY but no one in Laramie has a rusted roof yet (there is a new house out near the cement plant that has two few small sections of rusted roof). When the material was delivered to UBC in Laramie the top sheet had some rust on it and the UBC guy called the manufacturer to tell them there was a problem.

Tuesday, July 27, 2010

Lighting Valence Supports and First Skylight

Threaded pipe to support the lighting valence.
An architectural theme of Dan Wheeler's original design for the house was a lighting valence that ran through every room in the downstairs of the house.  The bottom of the valence is at the same level as the soffits outside providing a continuity between inside and outside.   With ordinary residential wood/aluminum clad windows it is difficult to get the effect as strongly as it might be with custom built windows, but Dan designed the house to be affordable and specified Marvin windows.  For a couple of reasons, as constructed, we dropped the valence from the bedrooms but kept it in the great room.


The lighting valence is built from 2X4's and sticks out from the wall 2'.  There will be two rows of separately switched  fluorescent fixtures with temperature adjusted bulbs on each side of the room which will light the large ceiling.  One detail that got built today was the supports for the valence shown below.


Dean  did some pull-ups to show the strength.

The first skylight also went in today. It really lit up the loft bedroom which will have another on on the opposite side of the roof.

Windows start to go in.

It'll be a very busy week with windows, skylights and doors arriving and being installed. Also, the roofing material is in and the roof will start to go on. With the wiring and plumbing done, the insulation will get sprayed too.

With the tyvek down we are once again astounded by the views.
One of the two large tempered glass double windows.

From the driveway side of the house.

Thursday, July 22, 2010

Plumbing and Electrical

Since the house was wrapped with Tyvek it hasn't  been as much fun to go up in the evening to check on progress. Until the windows and doors are delivered and installed, it's going to stay almost completely wrapped.  The plumbers and electricians are working away inside and it's hot.  They did cut open one upstairs window.
Looking out the loft bedroom window.




Wires wires wires.


The entry hall and stairs up and (eventually) down.

The Kitchen wall in the great room.


Looking down the hallway to the bedrooms on the main floor.

Switches by the "front" door