Monday, October 25, 2010
Sunday, October 17, 2010
Moose Visit
| Cow moose coming for a visit. |
On Friday, Cowboy Movers managed to get the furniture and most of the heavy items moved into the house and basement. I regret that I was too distracted to get photos. We did a lot of organizing and unpacking on Saturday and then on Sunday Jeff came with his llama van to help us move the books and garage stuff up. While Jeff and I were eating lunch, a cow moose and her calf came to visit.
| Calf following. |
| They stayed for fifteen minutes or so, just checking out the house. |
Saturday, September 25, 2010
Moldings
We had a friend to dinner last night -- we took her up to the house and she wondered how could you choose colors before living in the space. Good question Barb! When we choose the finish color for the interior doors and the moldings we were supplied with a sample in the form of about eighteen 2"x6" pieces of stained wood on a chain. I was trying to match the door finish from the last house that had custom made solid red oak doors. We choose the closest color we could. Now the doors are here and they look a bit too orange and the molding seems definitely too orange and there was too much contrast with the floor. Penelope decided we needed to paint the molding. Dean was able to replace the stained oak with a pre-primed MDF molding that is ready to be painted. We decided to match the baseboards and window and non-interior door casings to the wall colors. For interior doors, we decided to case them with the oak stained to match the door color. P volunteered to do the painting (and I helped.)
| P hurt her hand painting previously, so she wrapped it in vet-wrap. |
| Dark red oak casing around exterior door. |
| Same door with wall colored casing. |
| Molding painting operation in the big room. |
Thursday, September 23, 2010
More Moon, more kitchen.
| Moon rise. |
It's amazing how many things can go wrong. The wall cabinets have been shoehorned in under the lighting valence, they were ordered to be the wrong height a few inches too tall, so the installers had to (I'm assuming) cut off 2"-3" of the bottoms to get them to fit under the lighting valence. Because of that, the height of the toe area under them is noticeably different from the rest of the cabinets. You don't stand up to a full height wall cabinet like you do to the sink or range, so functionally, it is not significant. But the showstopper is that the ovens won't fit in the cabinets. The opening is supposed to hold double ovens, problem is that the opening is wrong, it is far too small.
| Full length cabinets. |
| Specifications for the wall ovens. |
| They look good - too bad they're wrong. |
| The finished cabinets -- more or less. |
The good news is that after living with the floors for only a few days they look fine to me. P says it is partially due to the scale of the space -- and I think that's a big part of it. Also, the color is of the wood is good, not too pink like a lot of red oak can be.
Wednesday, September 22, 2010
Kitchen Cabinets
| They're this big. |
| Maple cabinets with a plain "Shaker" style door. The sink and dishwasher go in the island. |
| The electricians have been working too -- schoolhouse lights over island (missing globes for now.) |
| The refrigerator goes under the extended cabinet. |
| Boxes behind contain full length cabinets for wall opposite refrigerator. |
Tuesday, September 21, 2010
Moon and More Doors and Floors.
| Moon rise looking out the NE door. |
| Floors are in the big room. |
| Looking toward the (future) kitchen wall. |
| A couple of the interior doors installed in the north bedroom. |
| Moon over Jelm Mt. |
First Shower Tiled
| Black 1" unglazed hex floors, matte white subway tile. |
| The top of the dam will be slate. |
| Carrara marble accent. |