Thursday, August 4, 2011

Footers for the deck

Eight inch sonotube placed three feet deep footers for the deck posts.

Hammering rebar into the poured concrete.

Thursday, June 16, 2011

Summer Evening

200° panorama of the valley at sunset.

Wednesday, June 15, 2011

Building the basement level patio.

Placing 16x16 pavers, each one weighing 35 pounds.

The pavers are placed on top of a level of fine gravel.

We worked hard to maintain a slight grade away from the house.

Sunday, May 22, 2011

Runoff started


Last year (2010)  we had record runoff and we lost much of our roadway over the culvert pipes. Not only did it break records but it was also the first big runoff in many years.  That meant there was a lot of deadfall in the creek that had not been washed out for a long time. This year we added another pipe so that we can handle a bit more flow than comes through the next bridge upstream. With a lot of hard work we built up the stonework on the upstream side.  You can see that the volume of water here was already almost too much for the pipes.  These photos were taken in the afternoon. We'd removed a log jam earlier in the day and had spent more time building up the rocks.  With an extra pipe and substantially more rock we expect the roadway to survive this year.


Thursday, May 5, 2011

Nearing completion of the RR tie installation.

Most of the used RR ties were oak and weighed as much as 200 pounds.

Manhandling a heavy tie.