| Front door leads down a hallway to the door onto the deck. |
![]() |
| The rust patina on the roof is getting deeper. |
![]() |
| Erdos studying the cottonwoods. |
![]() |
| We started the decking on the 12th and had done the posts as well. |
![]() |
| Cutting out the door. |
![]() |
| We'd already made the cut inside - the door was framed and sheet rocked over so all we had to do was to cout it out. |
![]() |
| An opening to the outside. |
![]() |
| Installing the door - it was a very tight fit. |
![]() |
| Resting after another long day. |
![]() |
| Readying the end posts. |
![]() |
| The posts are centered on the footers. |
![]() |
| Bolting the post into the concrete retaining wall. |
![]() |
| Even with the block and tackle, we had to use the truck to lift the glulam. |
![]() |
| Our tripod was almost not tall enough. |
![]() |
| Centering the glulam on the post. |
![]() |
| Middle posts set. |
![]() |
| We added a joist for stability over night. |