Friday, August 13, 2010

Evening visit.










Sheetrock taping

Stairs are open up and down, there is an enclosed landing in the basement.

Exit from downstairs bedroom - closet on left wall.

Door out of bedroom, bathroom door to the left.

Other end of the same bedroom, closets.


Bathroom off a downstairs bedroom.

Skylights at the top of the stairs.

Loft bedroom - closets to left and right.

Morning at the site.





Stucco base coat getting finished up.







Thursday, August 12, 2010

Stucco work continues.

Stucco going on the back of the house.

Ricky, el Jefe, and his main texture artist.

Sheetrock taping

Power/Water/Telephone

Filling the trench  to the well and transformer.